Project Description

17th Mar 2022 – The first lift (or level) of rammed earth for studio walls is complete

The first lift (or level) of rammed earth for studio walls is complete, and ramming has begun on lift 2 right above it.

We’re going layer by layer and brick by brick, as on the other side of the studio the compressed earth block walls are also starting to form
🧱🤗